Jumpstart Trailblazer
Operational Decision Intelligence for healthcare — guide the decision, capture the evidence, defend the outcome.
01 — How to use this deckPart A · Overview

Four parts. One document.

Jump with the Part buttons in the nav, or arrow through in order. Print / PDF for handouts.

  1. A
    Overview — what ClarityComply is
    Gap, category, triad, stack, audiences, takeaways
  2. B
    Pitch — what to say
    30s open, 90s core, proof lines, close ask
  3. C
    6-min Wet Pack intro
    Timed talk over amber ★ auto demo at /practice-tablet-auto/
  4. D
    Run of show + Q&A
    Longer meeting map, audience codes, objections
02 — The GapPart A

Tracking knows where the tray went. Not whether the call was right.

Sterile processing already has systems of record. What’s missing is guided decisions at the moment of work — with proof that survives a survey.

01
Today

PDF · binder · memory

IFUs and standards live in binders. Staff reconstruct the story after the shift.

02
Cost

Wrong call, weak proof

Invalid actions aren’t blocked in the moment. Evidence is incomplete when it matters.

03
Need

Guide + evidence together

Tell them what to do next — and capture a survey-ready record as work happens.

03 — CategoryPart A

Operational Decision Intelligence for healthcare.

ClarityComply converts standards, manufacturer IFUs, and facility policies into real-time operational guidance — so staff know exactly what to do next.

System of Record

Tracking & logistics

Censis, SPM, T-DOC, Ascendco — where the tray is. Necessary. Not sufficient for decision quality.

System of Guided Decisions

ClarityComply

What to do next under IFU and standard — hard gates when invalid, proof in the same motion.

A tracking system tells you where the tray went. ClarityComply tells you whether the call was right — and proves it.

ClarityComply · positioning
04 — The TriadPart A

Guide. Capture. Defend.

Three jobs, one loop — compliance is what occurs when every decision is correct.

Guide
Next step
IFU- and standard-gated workflows — wet pack, HLD, IUSS, load release, ST108
Capture
As it happens
Contemporaneous, attributed records — no end-of-shift reconstruction
Defend
Survey-ready
Standard-cited evidence when CMS, AORN, or AAMI ask
05 — How It WorksPart A

One layer. Two views.

Station · floor

Scan in · get guided · record builds

Token session. No account, no password, no PHI. Gates block invalid actions while the record writes itself.

Department · oversight

Open workflows · exceptions · roll-up

Supervisors see live open work, holds, and approvals — same decisions, from above.

Also: Water · ST108 · maintenance · OEM IFU → station

06 — Standards & IFUsPart A

Your IFU shouldn’t stop at the PDF.

AAMI ST79
SPD · steam
Wet pack · IUSS · load release
AAMI ST91
Endoscope · HLD
With SGNA / facility SOP
AAMI ST108
Water quality
Sampling · action levels
Facility + OEM
IFU · SOP
Encoded as gated floor steps
07 — Who It’s ForPart A

One engine. Audience-native paths.

Facility

Floor → oversight

Station guidance, department roll-up, survey-ready records across shifts.

Manufacturer · OEM

IFU → station

Your IFU is only as good as the reprocessing that follows it.

Investor · partner

Traction path

Short walkthrough + station launch + VC data room — low friction.

08 — What ChangesPart A

From documenting afterward to guiding in the moment.

Before
IFU as PDF in a binder
Tribal knowledge by shift
Evidence reconstructed later
Invalid action caught after the fact
·
→
→
→
→
With ClarityComply
IFU as gated steps on the tablet
Institutional decision graphs
Contemporaneous attributed record
Hard gate before the mistake
09 — Where It FitsPart A

Sits on top of tracking — does not replace it.

ClarityComply
Floor decisions — guided & proven
Station · department · IFU gates · ST79 / ST91 / ST108 · survey-ready evidence
▲ complements
Existing tracking / logistics
System of record — location & flow
Tray tracking · instrument logistics · enterprise SPD platforms
10 — TakeawaysPart A

Language to carry out of the room.

01

Category: Operational Decision Intelligence — guided decisions, not another tracker.

02

Loop: Guide the decision · capture the evidence · defend the outcome.

03

Proof: Contemporaneous records beat reconstructed binders.

04

Fit: Complements tracking; encodes IFUs and AAMI as live controls.

05

Show: Wet Pack amber ★ auto demo — or Demo Portal path for the audience.

Part B
Pitch talk track.
What to say aloud — 30-second open, 90-second core, proof lines, close.
11 — 30-second openPart B · Pitch

Land the gap first.

Say this

“Tracking knows where the tray went. ClarityComply tells you whether the call was right — and proves it. We’re not another SPD tracker. We’re the decision-and-evidence layer on top — guide the step, capture the record, defend the outcome.”

Guide
Next step
At the point of work
Capture
Same motion
No reconstruction
Defend
Survey-ready
When they ask
12 — Core pitch · ≈ 90sPart B

Category in one breath.

Say this

ClarityComply is Operational Decision Intelligence for sterile processing and related regulated workflows. We turn AAMI standards, manufacturer IFUs, and facility policies into real-time guidance on the station tablet — with hard gates when the call is invalid — while a contemporaneous, attributed record builds as the work happens. Logistics stay with your tracker. We own the missing layer: was the decision correct, and can you prove it?

Proof lines · pick 2

Keep ready

“Your IFU shouldn’t stop at the PDF.” · “Compliance is what happens when every decision is correct.” · ST79 · ST91 · ST108 as live controls · Complements tracking — doesn’t replace it.

Close · 15s

Ask

Make the right decision the default. Next: 6-min Wet Pack auto (Part C) or Demo Portal path that matches this room — Facility, OEM, or Investor.

Part C
6-min Wet Pack intro.
Talk over the amber ★ auto demo — full ST79 wet-pack walkthrough, hands-free.
13 — Pre-stagePart C · 6 min

Before you speak.

Demo

Practice Tablet Auto

Open /practice-tablet-auto/ full screen. Amber ★ = Wet Pack ST79. Leave green ★ alone. Sound off. Sterilizer tag visible on the left.

Clock

~45s → ★ → ~3.5–4 min → land

Open · tap amber ★ (5s countdown) · narrate while it runs · land triad · close ask. Do not pause mid-flow.

Link: /practice-tablet-auto/

14 — Six-minute clockPart C

Run of the minute.

0:00
Open
“Tracking knows where the tray went. When moisture shows up at unload, the tech still needs what to do next — and proof. Guide · capture · defend.”
0:40
Cue · tap amber ★
“Five-second countdown, then a full Wet Pack · AAMI ST79 walkthrough. Hands-free.”
0:50
Narrate — don’t click
Park questions: “Hold that — we’ll land it when the record closes.”
4:45
Land
“Guided ST79 steps · quarantine documented · defensible record — not reconstructed after the shift.”
5:30
Ask
“Make the right decision the default. Who owns the follow-up? Facility portal path or working session on unload.”
15 — Talk beats on autoPart C

Point at the screen. Don’t interrupt the finger.

Scan / start

Station attributed

Tag on sterilizer → token session. No login, no PHI.

Steps 01–03

Context + discovery

Sterilizer · where found · moisture type — ST79-aligned.

Steps 04–05

Disposition + load

Quarantine · check rest of load — wet packs cluster.

Steps 06–07

Cause + next action

Drying / load factors · full reprocessing — record builds as they answer.

Confirm

Wet Pack Recorded

Defensible capture in the same motion.

Records → End

Survey trail

What a surveyor can ask for. Session ends cleanly.

Do: amber ★ only · full screen · end on owner. Don’t: green ★ · FULL portal · restart mid-demo.

Part D
Longer meeting flow.
When you have 25–30 minutes — slide map, audience codes, Q&A.
16 — 25–30 min mapPart D · Flow

Protect the demo block.

Time
Focus
Do
Intent
0:00
A 01–04
Gap → triad
Shared language · 30s open
8:00
A 05–09
Views · standards · stack
Don’t replace tracking
15:00
C or Portal
Wet Pack ★ or live portal
One path deep
24:00
A 10 + ask
Takeaways · owner
Confirm next step
17 — Audience codesPart D

Match the room.

Facility · FACILITY

Floor → oversight

Guided facility path · station + department videos/demos. Emphasize record as work happens.

OEM

IFU → station

“IFU only as good as reprocessing that follows.” IFU video → station launch.

INVESTOR

Traction + data room

Low friction · videos → station → VC data room. Don’t SPD-tour.

Portal: http://localhost:8090/ · avoid FULL for guests

18 — Q&APart D

Likely questions.

Does this replace our tracker?
No. Tracking stays logistics. We are the guided-decision and evidence layer on top.
Where does PHI live?
Station demos: token session — no account, no password, no PHI.
How do IFUs get in?
Encoded as gated workflow steps, not filed PDFs — OEM path shows IFU → station.
Try it after this meeting?
Issue a user + code in Demo Portal admin with only their audience checkboxes. Visits summarize for follow-up.
Make the right decision
the default.
Guided in the moment. Provable forever. Jumpstart Trailblazer — one deck.
CC ClarityComply · Jumpstart
claritycomply.com
01 / 20